St. Louis Lambert International Airport AFM and SRE
PARIC Corporation (GC) is requesting bids for the Relocation of Airfield Maintenance (AFM) and Snow Removal Equipment (SRE) Facilities at St. Louis Lambert International Airport. The proposed Work includes Construction of a new 35-acre campus with (2) main buildings built upon the land totaling 230,000 sq ft of enclosed space. The campus will be equipped with a central stores warehousing facility, administrative space, landscaping ops, auto shops, fueling, salt and sand storage buildings and snow removal equipment (SRE) pre-engineered metal vehicle storage building.
Status
Accepting Bids
Bid Date | 4/11/25 3:00pm |
Bid documents are available on SmartBid. If you would like to receive an invitation to bid this project or for more information, please contact Trena Alexander (tlalexander@paric.com).