Mississippi Greenway: Water harvesting system repair (897D)
Background: The existing water harvesting system (Wahaso) was installed between 2014- 2016. After the system was installed the pit/vault the control panels are located in flooded. Since that time the system has not operated. Repair attempts have been made with no success. The goal of this project is to replace the damaged components with a new system that can handle the high heat and moisture environment the system is located in. Work consists of: • Removal and replacement of existing water harvesting pumps, control panels and components with new pump station including water harvesting pump, control panel and associated system components as outlined in drawing and specifications. Basis of design in Watertronics pump station. An equivalent design will be evaluated for acceptance by National Park Service and Great Rivers Greenway. • Inspect all electrical connections, control panels, and electrical wiring to ensure that all is up to code and no damage is present. Remove all unused wires and panels. • Install a second sump pump with a battery backup system.
Plan Holders
Date | Company | Contact |
5/9/24 7:00 am |
Dodge Data & Analytics
2860 S State Hwy 161 Ste 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Tel: 413-376-7032
|
5/8/24 1:41 pm |
Kozeny-Wagner, Inc.
951 West Outer Road Arnold, MO 63010 |
Kristen Fels
Tel: 636.296.2012
|
5/7/24 11:43 am |
MoKan
4666 Natural Bridge St. Louis, MO 63115 |
Kabir Muhammad
Plan Room Manager
Tel: 314-454-9675
|
5/7/24 2:20 pm |
PWXPress
1900 Coffeeport Rd Jacksonville, FL 03220 |
Mary Miller
Tel: 4086768941
|
5/13/24 12:56 pm |
Schulte Supply
150 Neptune Court St. Peters, MO 63376 |
James Casteel
Estimator
Tel: 636-387-5353
Fax: 636-387-5383
|
5/7/24 1:48 pm |
Southern Illinois Builders Association
1468 Green Mount Road O'Fallon, IL 62269 |
Stephanie Foster
Tel: 6186249055
Fax: 618-624-9065
|
5/7/24 12:21 pm |
ePlan
1400 FORUM BLVD STE 7B Columbia, MO 65203 |
Amber Cox
Tel: 5734477130
Fax: 573-355-5404
|