8771 Terminal 1 Departures Bridge over Bag Claim Drive at St. Louis Lambert International Airport
The proposed Work includes new bearings at the south abutment to replace existing steel roller bearings and concrete repairs to the Terminal 1 Departures Bridge Over Bag Claim Drive at St Louis Lambert International Airport.
Plan Holders
Date | Company | Contact |
4/24/24 5:59 am |
Dodge Data & Analytics
2860 S State Hwy 161 Ste 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Tel: 413-376-7032
|
4/25/24 11:16 am |
MoKan
4666 Natural Bridge St. Louis, MO 63115 |
Kabir Muhammad
Plan Room Manager
Tel: 314-454-9675
|
4/23/24 8:24 am |
PWXPress
1900 Coffeeport Rd Jacksonville, FL 03220 |
Mary Miller
Tel: 4086768941
|
5/21/24 9:11 am |
Phillips Concrete Services, LLC
6439 Plymouth Avenue Suite 110 Saint Louis, MO 63133 |
Alfredo Jones
President
Tel: 314-420-9857
Fax: 3148680146
|
4/29/24 10:02 am |
Raineri Construction
1300 Hampton Ave Suite 200 St Louis, MO 63139 |
Jen Nolte
Tel: 3146675913
Fax: 3146675638
|
4/23/24 1:52 pm |
Southern Illinois Builders Association
1468 Green Mount Road O'Fallon, IL 62269 |
Stephanie Foster
Tel: 6186249055
Fax: 618-624-9065
|