8771 Terminal 1 Departures Bridge over Bag Claim Drive at St. Louis Lambert International Airport
The proposed Work includes new bearings at the south abutment to replace existing steel roller bearings and concrete repairs to the Terminal 1 Departures Bridge Over Bag Claim Drive at St Louis Lambert International Airport.
Plans
(click to expand/collapse)
Name | Size | ||
8771 Drawings | 8.2 MB |