RFQ - Traffic Management Enhancements, Phase 8 - North Broadway (Cass to Riverview)
Proposed improvements will include signal upgrades and/or enhancements, fiber optic interconnect, traffic monitoring cameras, signal timing and optimization, system integration with the City’s Real-Time Transportation Intelligence Center (TIC), and sidewalk improvements as needed for ADA compliance. The project will be generally located along the North Broadway corridor, from Cass to Riverview, and also on Halls Ferry Road, from North Broadway to Veronica Ave. The total project length is approximately 7.4 miles (6.8 miles on the North Broadway corridor and 0.6 miles on Halls Ferry Road). Additional improvements outside of the North Broadway corridor may be necessary to provide connectivity to the TIC and redundancy to the City’s fiber optic network. II.
Bid Documents
(click to expand/collapse)
Name | Size | ||
Affidavit of Compliance With Anti-Discrimination Against Israel Act 11-22-23 | 10.4 KB | ||
CMAQ-5422(622) - RFQ | 243.5 KB | ||
CMAQ-5422(622) - TIP application | 5.3 MB | ||
DBE Form | 73.6 KB | ||
E-Verify Affidavit | 38.3 KB |