GRG Bid#2025-003-308l Brickline Greenway: North Connector Greenway(308I)

Construction of the Brickline Greenway North Connector segment along the west side of Grand Boulevard from Natural Bridge to Cass, the south side of Cass from Grand to Spring, and the west side of Spring from Cass to Page. This scope includes the greenway trail and new sidewalk, curbs, seatwalls, unit pavers, street reconfiguration, signals, street and pedestrian lighting, utilities, trees, landscaping, irrigation, trail signage and wayfinding, and site furniture. The work consists of furnishing all material, labor, tools, equipment, and supervision necessary for the construction of the items noted above in accordance with all the requirements of these specifications, and the drawings made a part thereof. Existing site amenities damaged during construction shall be replaced at no cost to the Owner.
Plans (click to expand/collapse)
Order this section for $345.60
This is available for download to registered users. Log in now
Name Size
693JJ32440255-BGNC Ph 1 Greenway-Final Plans-for BID-20250401 201.1 MB