8788 Reconst. of Taxilane Charlie from Taxiway S to Taxiway G Project 3
The proposed Work includes full depth removal and reconstruction of PCC taxiway pavement along Taxilane C from Runway 6-24 through Taxiway C7. Construction of new C8 and reconstruction of C7 are also included. Replacement of asphalt shoulder, electrical infrastructure, and storm drainage infrastructure is also included. Installation of new artificial turf islands is also included.
Plan Holders
Date | Company | Contact |
4/17/25 2:42 am |
Dodge Construction Network
2860 South State Hwy 161 Suite 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Tel: 413-376-7032
|
4/15/25 6:27 pm |
MDBA
37 West St New York, NY 100001 |
Dan Mihai
Tel: +4024577811
|