8788 Reconst. of Taxilane Charlie from Taxiway S to Taxiway G Project 3
The proposed Work includes full depth removal and reconstruction of PCC taxiway pavement along Taxilane C from Runway 6-24 through Taxiway C7. Construction of new C8 and reconstruction of C7 are also included. Replacement of asphalt shoulder, electrical infrastructure, and storm drainage infrastructure is also included. Installation of new artificial turf islands is also included.
Bid Documents
(click to expand/collapse)

Name | Size | ||
004306-Unauthorized Alien Employee Affidavit-05-10-2022 | 127.0 KB | ||
004308-Affidavit, Bidder Relationship with City-05-10-2022 | 32.9 KB | ||
004325-Substitution Request Form-05-10-2022 | 74.9 KB | ||
DBE Utilization Plan Packet | 672.8 KB |
Specs
(click to expand/collapse)

Name | Size | ||
8788 Specifications | 57.5 MB |